In the year 2005, a decision about the revitalization of the original CENTROTEX warehouse building was made. The building, with a reinforced concrete construction, was built in 1986 and was used as a central warehouse for textile products until 2003. The original cost of the heating (steam supply system connected to a central boiler room) were approximately 2 500 thousand CZK/ year. > > >